Five (5) Reasons To Love #SignalFreeJailRoad as a #Project

(DISCLAIMER: As much as it might seem like it, or no matter ho much you’d be tempted to think that way, this post is not an add campaign for those building the “Signal Free Jail Road”. This post is just an expression of what I, as an engineer and a policy analyst felt. Because, I know, criticism is sexy but honest appreciation is even sexier still)

You’ve read extensively about how the “Signal Free Jail Road” will benefit the city of Lahore in multiple ways in dealing with its current and future traffic problems. However, this blog is focusing on the “Signal Free Jail Road” as an infrastructure project and why should it be loved.

Any who uses this road everyday to work and back, has a pretty good idea of how challenging doing ANYTHING on this super busy intersection was. Just some of the challenges included were:

  • Managing the everyday flux of the traffic in a road with massive trade centers, major hospital and a number of large educational institutions draw thousands of cars every day.

  • Ensuring zero damage to life (injuries or worse)by accidents related to the project

  • While doing that, keeping an aggressive pace of work, prioritizing and completing the toughest and most disruptive parts first

  • Not compromising on the promised standards, planning or conservation guidelines

As it turns out, the project has been doing a near perfect job to deal with all these issues.

Both Under-Passes  are virtually almost complete

(1) Shadman Underpass

DJI_0013-5556-800-600-80 DJI_0005-5555-800-600-80 DJI_0021-5557-800-600-80 DSC_3940__1_-5520-800-600-80

(2) Gulberg Underpass

DSC_3928__1_-5519-800-600-80 DSC_4015-5541-800-600-80 DJI_0193-5511-800-600-80

(3) The Project uses night-time for major work

DSC_9969-5488-800-600-80 DSC_9949-5487-800-600-80

(4) Traffic management has been more or less bearable as compared to what we saw in the past

DSC_4015-5541-800-600-80 DSC_3955-5521-800-600-80

(5) Oh! And yeah, we got to keep over 96 % of all our Trees

DSC_4020-5542-800-600-80 DSC_4015-5541-800-600-80 jr1

(Images Courtesy: Habib Constructions, because i dont own a drone lol)

Why NOT to Blame All Evil on Building Road Infrastructure in #Pakistan

transportation-communication-of-pakistan-ppt-4-638

I am writing this particular blog because every disaster and every problem in our beloved country appears to be because we are building roads (hilarious? I know).

In case of deaths due to heat surge….. We Criticize Motorways, Mass Public Transits Metro, Underpasses, Flyovers. In Case of Floods……………….We Criticize Motorways, Mass Public Transits Metro, Underpasses, Flyovers. In case of Law and Order Crisis………….We Criticize Motorways, Mass Public Transits Metro, Underpasses, Flyovers. Here is why it is wrong and stupid.

This attitude has reached crazy levels where we, as a nation, refuse to use a single brain cell and understand the how national economies work. So I’ve put together some food for thought in bullet points, in the easiest possible words, to help understand WHY is focusing on roads/transport infrastructure/ traffic engineering NOT WRONG, infact why is its CRUCIALLY ESSENTIAL.

transportation-communication-of-pakistan-ppt-5-638

Development is related at improving the welfare of a society through appropriate social, political and economic conditions. The expected outcomes are quantitative and qualitative improvements in human capital (e.g. income and education levels) as well as physical capital such infrastructures (utilities, transport, telecommunications).Development cannot occur without both as infrastructures cannot remain effective without proper operations and maintenance while economic activities cannot take place without an infrastructure base.

When transport systems are deficient in terms of capacity or reliability, they can have an economic cost such as reduced or missed opportunities and lower quality of life.

When transport systems are efficient, they provide economic and social opportunities and benefits that result in positive multipliers effects such as better accessibility to markets, employment and additional investments.

Assessing the economic importance of Transport Infrastructure & Transportation

  • Core. The most fundamental impacts of transportation relate to the physical capacity to convey passengers and goods and the associated costs to support this mobility. This involves the setting of routes enabling new or existing interactions between economic entities.
  • Operational. Improvement in the time performance, reliability, reduced loss or damage, better utilization level of existing transportation assets benefiting its users as passengers and freight are conveyed more rapidly and with less delays.
  • Geographical. Access to a wider market base where economies of scale in production, (raw materials, parts, energy or labor) and broader markets for diverse outputs (intermediate and finished goods).

Pak-China Industrial Corridor

  • Macroeconomic level Transportation and the mobility it confers are linked to a level of output, employment and income within a national economy. In many developed countries, transportation accounts between 6% and 12% of the GDP.
  • Microeconomic level: Transportation is linked to producer, consumer and production costs. The importance of specific transport activities and infrastructure can thus be assessed for each sector of the economy. Usually, higher income levels are associated with a greater share of transportation in consumption expenses. Transportation accounts on average between 10% and 15% of household expenditures, while it accounts around 4% of the costs of each unit of output in manufacturing, but this figure varies greatly according to sub sectors.
  • Direct impacts. The outcome of improved capacity and efficiency where transport provides employment, added value, larger markets as well as time and costs improvements. The overall demand of an economy is increasing.
  • Indirect impacts. Indirect value-added and jobs are the result of local purchases by companies directly dependent upon transport activity.
  • Induced impacts. The outcome of the economic multiplier effects where the price of commodities, goods or services drops and/or their variety increases. For instance, the steel industry requires cost efficient import of iron ore and coal for the blast furnaces and export activities for finished products such as steel booms and coils. Manufacturers and retail outlets and distribution centers handling imported containerized cargo rely on efficient transport and seaport operations.

Lahore_Map

Step-Up Revolution – Lahore Traffic Engineering

     With every passing phase of the construction of Jail Road Signal Free Corridor, the criticism by minority sections is being answered. Every single lie and negative propaganda has been exposed as the picture of the final product that is the #SignalFreeJailRoad emerges on scene. 

There can be a thousand words written to unmask the hypocrisy of those who went to the extent of blocking this project through the esteemed Court. However, it is best to let the visual proof apprise our readership with what is happening on ground during the construction of this project.

So lets answer those objections one by one.

(1) This Project Is An All Out War On Trees, Does Not Care About Environment, Is Eager to Cut Down Trees/Plantation

DSC_8714-5320-800-600-80

Special measures being taken ensure the possible survival of every tree.

(2) It Would Be Impossible To Commute Through Main BLVD Intersection During Construction

DJI_0036-5272-800-600-80The traffic flow planning done by the project professionals made it possible for the traffic to operate smoothly.

(3) Shadman Underpass Construction Will Paralyze The Traffic 

DJI_0085-5298-800-600-80

As we can see the ‘Paralyzed ‘ traffic

(4) The Trees and GreenBelts Alongside Jail Road Will Be Comprpmised/ Eliminated

DSC_9138-5351-800-600-80

The greenbelts and conserved trees along both sides

(Photo Credits: Habib Construction- because I dont have a drone cam 😛 )

Jail Road Signal Free Corridor – Myth Vs Reality (pictorial)

FInally, after all the drama and Lahore Bachao Tehreek’s tantrums the construction work of Jail Road Signal Free Corridor is finally underway at full throttle.

There has been misinformation spread by the Lahore Bachao Tehreek about how the entire green belts will be gulped up by this “Concrete Jungle”. Also the propaganda that the construction process will be turning the entire area into a chaotic dust and sand storm.

So we thought it would be nice to keep the people of Lahore updated on what is going on during construction phases and how the maximum possible of greenbelts and trees cutting will be avoided, in addition to adopting all procedures necessary for public convenience from easy alternate routs to construction material management.

Would love to answer any questions that may arise in your mind after watching the picture and would also appreciate any comments or suggestion you might want to share. FOr now lets just Enjoy watching and being a part of building our city’s future   🙂
downloadfileTAR_7928 asp
TAR_7887 TAR_7901 TAR_7904 TAR_7908 TAR_7911 TAR_7920 TAR_7922 TAR_7924